The pool refurbishment.

Click on the thumbnails below to load larger pictures in a new window.

Photos are in time order, latest images at the bottom of the page.
Week 16 (23 Sept 2007)
Basin now concreted - sides nearly ready
1. Basin now concreted - sides nearly ready.
2. Ready for pool plant to be lifted
into place.
Ready for pool plant to be lifted in to place.
 
Week 17 (30 Sept 2007)
New Pool Plant installed
1. New Pool Plant installed
2. Pool Basin almost complete
Pool Basin almost complete
 
Week 18 (07 Oct 2007)
Pool plant room now built
1. Pool plant room now built
2. What is missing?
What is missing?
 
Week 19 (13 Oct 2007)
Pool Plant Room awaiting roof going on
1. Pool Plant Room awaiting roof going on
2. A pool will emerge from the "chaos".
A pool will emerge from the
 
Week 20 (21 Oct 2007)
1. Pool Plant Room Roof nearly on
Pool Plant Room Roof nearly on
Southside of the Pool
2. Southside of the Pool
3. Concrete now complete in the basin - will it leak?
Concrete now complete in the basin - will it leak?
The Roof is in this lorry
4. The Roof is in this lorry - arrived in this country from France- at a secret location in the Swindon area!

 

Weeks 11-15

 
 
Click to go back to the top of the page
Link Magazine
The Lighthouse Bookshop, 40 High Street, Highworth, Swindon SN7 7AQ
Tel: (01793) 861690
Email the editor
   www.highworthlink.co.uk
 
Email Web Editor with questions or comments about this web site. Last modified: 20-Jul-2008